BACK TO calculators
/
[TRENCH EXCAVATION]

Trench Excavation Calculator

Estimate trench excavation volume based on bottom width, depth, slope ratio, and soil swell. Calculates bank volume and loose volume after excavation.
[CROSS_SECTION]
TOP WIDTH b d 1 s
[INPUT_PARAMETERS]
FT
FT
RATIO

0.75:1 — hard solid soil
1:1 — soil likely to crack
1.5:1 — soft sandy loose soil

FT
%
[NOTE]

The slope ratio defines horizontal run per unit of vertical depth. For hard solid soil, use 0.75:1. For soft sandy loose soil, use 1.5:1 or greater. Volumes are calculated as standard trapezoidal prisms and converted to cubic yards for standard haulage estimation.

[CALCULATION_OUTPUT]
Excavated Volume (Loose)
0.00 yd³
Bank Volume (In-situ)
0.00 yd³
Top Width
0.00 ft
Slope Angle
0.0 °
Cross Area
0.00 sq ft

Formula Applied

Vbank = [ (b + (b + 2·s·d)) / 2 ] · d · L
  • Vbank : in-situ volume (converted to yd³)CALC
  • Vloose : Vbank · (1 + SW/100)CALC
  • b : bottom width (ft)INPUT
  • d : trench depth (ft)INPUT
  • s : slope ratio (horiz:vert)INPUT
  • SW : soil swell factor (%)INPUT

Densities of Typical Pipe-Trench Fill

Material Type Density (lb/ft³) Density (kg/m³) Typical Swell (%)
Common Sand (dry)100 - 1101600 - 176010 - 15
Common Sand (wet)120 - 1301920 - 208010 - 15
Sandy Clay110 - 1201760 - 192015 - 20
Clay (dry)100 - 1101600 - 176020 - 30
Clay (wet)120 - 1301920 - 208025 - 35
Gravel (loose)95 - 1051520 - 168010 - 15
Crushed Stone100 - 1101600 - 176010 - 12